According to the size and size of the room, after buying the carpet, it should be calculated according to the length dimension and then cut well. The room will be gradually pushed to the door when the shop is installed.
If the width of the carpet is not consistent with the width of the room, the width should be marked on the back of the carpet and cut with a carpet cutting edge.
Two pieces of carpet need to splice junction, the seam on both sides and on the carpet glue onto the seam tape liquid or with dedicated carpet seam tape will carpet seams good paste, with a new carpet is around the corner, hsiu-chi, planish, put on the furniture.

A carpeted pavement.
The first step of installing carpet fixing nail strip is the first step of paving carpet. It is applicable to the full spread of rolled carpet with separate elastic rubber cushion.
Specific methods and procedures are as follows:
First clean up the room, around the room along the edge of the skirting board with high strength masonry nail to nail barb nail article card on the ground, masonry nail spacing is less than 400 mm, barb nail article card is apart from the skirting board of 8 ~ 10 mm, pour CiXie nail should be toward the wall.
Pavement elastic rubber mat, rubber mat should leave the barb nail card article 10 mm, to spread some sticky method, namely the first shop along the long side, good side of the rubber gasket, then put down the other side, measure the size, make it from the other side of the agnail board 10 mm, spring wire cutting, with 107 glue stick on the ground at the grass-roots level.
Will carpet is one of the long side on the barb nail article first, all the burrs border mask within the skirting board or with the skirting board with compaction, plow and the fixed side to side, with special carpet tide child repeated several times after, should be fixed on the other side of the agnail board, to spare parts, with cutting knife cutting burrs blends flatten within the skirting board, using the same method of fixed on both sides of the rest.

There is no barbed plate at the door, and the carpet is compacted by the edge strip.
Finally, use the vacuum cleaner to clean up the villi in the installation process to smooth the surface of the carpet.

A blanket of carpet is fixed.
If carpet is thinner, people walking on it would be easy to uplift, neither beautiful nor safe, time is long carpet will be out of shape, repair is very trouble, so adopt the bonding fixed surfacing method, specific steps are as follows:
If you are laying carpets in a room with frequent activities and less furniture, you should use a full brush.
The carpet is in the room, the size should be consistent with the room, the Mosaic method is consistent with other pavement method.
The carpet rolled up 1/2 above, in the middle of the floor brush carpet glue, drying after 5 ~ 10 minutes, will be on the carpet, wait for after adhesive is firm, roll up, on the ground after the brush glue on the carpet, and then use the same method of pavement.
When paving the carpet, must pull the carpet flat, smooth, compaction, the periphery redundant part, use the knife to cut off after pressing flat.